New Skyline Parkway Roundabout
For bid information on current Ogden City projects, please visit bids.ogdencity.com

Current Street Projects


North Street Road Improvements

Complete road reconstruction from Washington Blvd to Monroe Blvd. Existing waterline to be replaced, curb & gutter to be installed on both sides of road, and sidewalk to be installed on north side of road. Improvements to the Western Canal crossing to be made, as well as a new traffic signal at the intersection of North Street and Monroe Blvd.

Contract awarded to: Staker-Parson Co.  801-731-1111     Status:  100% Complete

17th Street Reconstruction



Complete road reconstruction from Wall Avenue westward to the Ogden City boundary.  This includes a new waterline from the railroad to the west end of the project, as well as new sidewalk and new curb & gutter.

Contract awarded to: Skyview Excavation & Grading  801-829-6524    Status:  85% Complete

Skyline Parkway Extension



Construction of a segment of Skyline Parkway that will connect Skyline as it runs from the roundabout above Weber State University to the south length of the parkway which extends from 4600 South all the way to Highway 89 in South Ogden.  This includes new sidewalk, curb & gutter and utilities.

Contract awarded to: Staker-Parson Co.  801-731-1111     Status:  90% Complete

Current Utility Projects

Water:


"5 Waterlines Project"



Hill-Beverly-Taylor 
 - Replacement of existing waterlines along Hill Dr., Beverly Dr. and Taylor Ave. with new, larger pipe.
26th & Tyler - Replacement of existing waterlines along Tyler Ave and 26th Street with new, larger pipe.
2500 Block of Porter Ave. - Replacement of existing waterline along Porter Ave between 25th & 26th streets with new, larger pipe.
2900 Block of Grant Ave. Replacement of existing waterline along Grant Ave between 29th & 30th streets with new, larger pipe.
2900 Block of Childs Ave. Replacement of existing waterline along Childs Ave between 29th & 30th streets with new, larger pipe.

Contract awarded to:  Associated Brigham Contractors  435-723-8529      Status: 100% Complete 

Sewer:


27th Street - Replacement of existing sewer main from Jefferson Ave to Quincy Ave.

 
Contract awarded to:  Associated Brigham Contractors  435-723-8529      Status: 90% Complete 


Upcoming Street Projects

Upcoming Utility Projects

Water:


Sewer: